top of page

![]() Carpe Diem | ![]() Delivery from Switzerlandfirst of 2 taxi drives to the post office | ![]() Delivery CheckMost of our stuff arrived on time |
---|---|---|
![]() Material DeliverySolar panel tubing arrived | ![]() Vera in actionout with the old crap | ![]() Clean, clean, clean |
![]() Too much stuffVera using her super-human organisational skills | ![]() Wiring new equipment | ![]() Plenty of room |
![]() Hard at work | ![]() 38°C in the engine room | ![]() Building solar panel frame |
![]() A little higher, please | ![]() 50% done | ![]() Last bolts |
![]() Watermaker installation | ![]() Watermaker | ![]() Sea anchor rope |
![]() Yay, new matress | ![]() *POLISHED* | ![]() All done |
bottom of page